Suicide Bridge Restaurant Force Main

Project Scope: Design and installation of 5+ miles of force main to connect failing septic system to Town of Hurlock Sewer system.

Location:  Hurlock, MD

The project included deed research, securing necessary permits from MDE and  County, Preparation of ROW plat and ROW SURVEY, flow survey and data compilation, pipe design and sizing, construction cost estimates and supervision and inspection of construction.  RAUCH also held extensive meetings with the Mayor, Town Engineer and MDE officials and handled all permitting phases, including seeking BRF funding.

 

Discipline:  Water, Wastewater & Pump Stations